APC Compliance can offer a total package of ‘L8 Remedial Works’ that would include:
Upgrading existing tanks to the L8 recommendation to include such items as:
- New compliant lids/lid vents
- Overflow screens
- New lagging
- New hatches
- Re-routing pipework to ensure correct flow through the tanks
- Re-routing ‘ hot return pipes’ form hot water systems
- The installation of new compliant tanks
- Dead leg removal
- Removal of redundant pipe work sections/showers etc
- Refurbishment of cooling towers to include
- Replacement of pack installs
- Replacement distribution systems
- Fit access hatches